Project Overview:
- Launched in late 2015, the $177m Bayswater Level Crossings Removal Project includes the realignment of Mountain Hwy and Scoresby Rd, with the rail line lowered and the road elevated.
- The initiative entailed the reconstruction of Bayswater Train Station with a new forecourt and public space, along with the refurbishment of the bus interchange and train station car park.
Our Project Involvement:
- Install of 1050mm, 1650mm and 1800mm Reinforced Concrete Pipework.
- 4 No. 5m x6m x 5m deep in-situ concrete pits.