Grange Road Level Crossing Replacement

Project Overview: 

  • The Level Crossing Removal Project, on behalf of the Victorian Government, aims to eliminate 75 hazardous and congested level crossings throughout Melbourne by 2025, including the Grange Road crossing removed in 2018 by lowering the train line.
  • Prior to its removal, the Grange Road level crossing’s boom gates caused significant delays, being down for about 40 minutes during the weekday morning rush and affecting around 25,000 vehicles. 

Our Project Involvement: 

  • GRP tank installation.
  • Installation of PC pump station and FRP elements.
  • Drainage line installation.
  • Pavement, excavation, and replacement. 
  • Shared user Path FRP, general civil works.