Tank 7 Construction at JUHI Refuelling Depot

Project Overview: 

  • The project consists of the construction of a 25m diameter, 13.5m high API 650 vertical tanks and its foundation for the storage of Aviation Turbine Fuel (Jet A-1).
  • Associated with this is the construction of new reinforced concrete bund walls, impermeable compound and drainage, access platforms and stairs as well as installation of product and firewater piping and other infrastructure as specified. 

Our Project Involvement: 

  • Bulk Excavation. 
  • Installation of Precast piles. 
  • Pavement Construction.
  • FRP of tank slab and bund walls (400m3).